Introduction
In April 2006 Yorkshire Water will reduce the water level in Doe Park Reservoir by one meter per week until the level has dropped by five metres. At that point, contractors can begin work to rebuild the dam and overflow. The work is expected to finish in December 2006. This means that there will be no sailing on Doe Park for most of the 2006 season. This blog is so that sailors and other interested people can follow the progress of the works.
0 Comments:
Post a Comment
<< Home